Troubleshooting cooling system problems for temperature-humidity chamber
At District 9, Ho Chi Minh City, a customer encountered a problem with the Vision Tec temperature-humidity chamber when the machine could not reach a negative temperature. As soon as the request was received, HUST Vietnam's engineering team arrived promptly to check and resolve the problem.
After conducting a thorough inspection, HUST Vietnam discovered that the machine's cooling system had run out of gas, leading to a situation where it could not reduce the deep negative temperature. Engineers quickly identified the problem and made a repair plan, fully preparing the necessary options and equipment.
With high experience and expertise, HUST Vietnam's engineers performed machine repairs carefully and conscientiously. The step of re-operating the machine for a thorough check to ensure everything is working normally is critical. Only when the machine works properly again will HUST's work be completed.
In addition, HUST engineers also provide several warnings to protect and help the machine operate more efficiently in the future. With the mindset of always wanting our customers to grow, HUST sincerely thanks our customers for their trust and support.
Some images:
Processing
The result